TRANSPORTATION | UNDERGROUND UTILITIES | SITE DEVELOPMENT & EARTHWORK

Owner/Client: City of Boulder
Engineer: Tsiouvaras Simmons Holderness (TSH)
Contract Amount: $12,450,000

Project included the removal of HMA pavement and reconstruction of 6,200 lineal feet of combination 4-lane and 5-lane urban arterial roadway to concrete pavement. Corridor work included the reconstruction of 5 signalized and 11 un-signalized intersections. Significant public utility work included: new storm sewer, waterline distribution systems, sanitary sewer collection systems, intersection traffic signalization and lighting. Minor structural work included the construction of a 12’ x 3’ x 90’ reinforced concrete box culvert under Broadway at the Farmer’s Ditch, including associated wing walls, headwalls, and replacement of an existing concrete headwall and drop structure for Two-Mile Canyon Creek at Iris Avenue.

Major work components included:

  • 35,000 square yards of concrete pavement
  • 14,000 lineal feet of curb and gutter
  • 6,100 square yards of concrete side walk
  • 11,000 cubic yards unclassified excavation
  • structural concrete work

TESTIMONIALS

CONTACT US

OFFICES:

Corporate
2027 West Colfax Avenue
Denver, Colorado 80204
Phone: (303) 562-2000
Fax: (303) 893-1949

GENERAL INQUIRES AND BID INFORMATION:
info@ceiconstructors.com

EMPLOYMENT INQUIRES:
careers@ceiconstructors.com